June 2010 - Suspension Refurb

    The valves were removed from the cylinder head which went off to the engineers shop for skimming and remedial work. This would enable lead free petrol to be used in the future. The front suspension was in need of inspection and repair, it was totally stripped down and rebuilt. Damaged tie rods were replaced with new, and re-assembly was carried out replacing all rubber bushes. Inspection, stripdown and cleaning of both front brakes was carried out, as was refurbishment of the heater motor and fan housing.

    emblem smBack to Selection Page

    © 2021 Grandad George. All Rights Reserved.