Inner Wings and Radiator Shroud in the improvised 'paint booth'.
Inner Wings and Radiator Shroud in the improvised 'paint booth'.
Heater matrix cover and radiator shroud mounting brackets.
Passenger side inner wing.
Scuttle vent wire mesh grille.
The radiator was recored and pressure tested by a local specialist company.
The radiator was recored and pressure tested by a local specialist company.
Refurbished radiator mounted in shroud.
Refurbished radiator mounted in shroud.
Refurbished radiator mounted in shroud.
Refurbished radiator mounted in shroud.
Bulkhead in finished paint.
Bulkhead in finished paint - masking removed.
Master cylinder bracket bolted on, both inner wings loose bolted on car.
Heater matrix cover bolted on.
Master cylinder bracket loose bolted to inner wing.
New rubber grommets fitted.
The painted engine compartment.
New copper brake pipes and components.
New copper brake pipes and components.
Fitting the front brakes pipework.
Fitting the front brakes pipework.
Close up of three way and stop light connection.
First stage of pipework fitting finished.
Pipework connected to master cylinder. Starter solenoid, voltage regulator, fuses and horn relay fitted.
Dual master cylinder connections, LH cylinder for brakes, RH cylinder for clutch.
Dual master cylinder connections, LH cylinder for brakes, RH cylinder for clutch.
Dual master cylinder connections, LH cylinder for brakes, RH cylinder for clutch.
System filled with Automec Silicone Dot 5 Brake & Clutch Fluid.
Metal labelling cleaned and re-attached to bulkhead.
Inner wing removed - it was loose bolted to achieve correct pipe bending.
Heater fan and hose fitted.
General view of finished work to date.
General view of finished work to date.
General view of finished work to date.
The inlet manifold after a thorough cleaning.
Close up of new front wheel slave cylinder.
New steering rack rubber gaiters fitted.
Photo of water pump connecting pipe for future reference.